According to NTSB, the trouble began when the train was at the Bethayres Station as the crew’s engineer called SEPTA’s Regional Rail Operations Control Center to report that the train was ...
On the day of the incident, when the train was at Bethayres Station, officials say an engineer contacted SEPTA's Regional Rail Operations Control Center (RROCC) at about 3:50 p.m. to report the ...
At about 3:50 p.m. on the day of the fire, an engineer contacted SEPTA's Regional Rail Operations Control Center (RROCC) in Philadelphia while the train was at Bethayres Station in Montgomery County.
an engineer contacted SEPTA’s Regional Rail Operations Control Center in Philadelphia and informed the dispatcher that he was at the Bethayres Station in Huntingdon Valley and the train was ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results